Electric Meter Base & Service Mast Replacement in Celina & Collin County, TX
Meter base, service mast, weatherhead and service entrance repairs - the storm-damaged equipment the utility will not touch because it belongs to you.

Your electric meter sits in a short chain of equipment that carries power from the utility's wire into your panel: the point where the service attaches to the house, the mast or riser conduit holding it up, the weatherhead on top, the service entrance conductors, and the meter base the meter plugs into. On an overhead service that whole chain is bolted to the outside of your house, exposed to every North Texas hailstorm and straight-line wind event - and almost all of it belongs to you, not to the utility.
That is the fact that surprises homeowners most. When a storm pulls the service loose from the wall, when a falling limb bends the mast, or when the inside of a forty-year-old meter base finally rusts through, the utility will come out, make the site safe and cut the power. Then it will tell you to call an electrician, because the damaged equipment is yours.
Tamenator Electrical Services is a licensed and insured, owner-operated electrician based in Celina, serving Collin, Denton, Dallas and Grayson County. We replace meter bases, service masts, weatherheads and service entrance conductors, pull the permit, meet the inspector, and stay with the job until the power is actually back on - which is the step that goes wrong most often.
What's included
- Assessment of the full service entrance - mast or riser, weatherhead, conductors, meter base, grounding and bonding
- Coordination of the utility disconnect before work starts, with the utility that actually owns the wire at your address
- New meter base sized and rated for the service, installed to the utility's own specifications
- Service mast, weatherhead, hardware at the point of attachment, and service entrance conductors replaced as needed
- Clearances and point-of-attachment height brought to current code, including raising the mast where required
- Grounding electrode system and bonding brought up to the code edition your city enforces
- Surge protective device, required whenever service equipment is replaced
- Permit pulled, city contractor registration handled, inspection scheduled - and the reconnect request made and followed up
Who Owns What: The Line That Decides Who Pays
There is a specific, named boundary in the electrical code where the utility's property ends and yours begins. It is called the service point - the point of connection between the serving electric utility and the premises wiring. Writing in EC&M, Mike Holt notes that conductors upstream of the service point are utility conductors - the overhead service drop, or the underground service lateral - and are not regulated by the National Electrical Code at all. Everything from the service point inward is premises wiring, which is to say yours.
On a typical overhead house in Collin or Denton County, that works out like this:
- The utility's: the transformer, the conductors running from it to your house, and the electric meter itself.
- Yours: the point of attachment hardware, the mast or riser, the weatherhead, the service entrance conductors, the meter base the meter plugs into, and everything downstream of it.
The practical consequence shows up after every major storm. Oncor's own storm guidance states it plainly: in some cases the meter base to your home or business may have been damaged or pulled off, and if so, you will need to contact an electrician to make the necessary repairs before Oncor can restore power. Power cannot be restored until that is completed. It is not the utility declining to help - it is the utility telling you where the property line is.
One piece sits on the other side of that line and matters: the meter itself is the utility's equipment. Nobody else should be pulling it, and you should not be tempted to. The utility has a procedure for cutting power at the meter safely, and that procedure is the first step below.
Which utility owns the wire at your address is worth confirming before anything is scheduled. Oncor delivers across most of Collin County, CoServ covers much of Denton County, and cooperative territory starts close to the county roads north of Celina. Your electric bill names your retail provider, which is usually not the company that owns the pole - and on this job it is the pole owner who has to act. Our service area pages cover the utility situation city by city.
The Four-Step Sequence After Storm Damage
This job has a fixed order, and skipping or reordering a step is what turns a one-day repair into a week without power.
- Get the power cut at the meter. Oncor's storm guidance directs customers with a damaged or pulled-off meter base to call Oncor at 888.313.6862 to initiate a temporary hazardous disconnect, so the service can be made safe and the repair can happen on de-energized equipment. Other utilities and cooperatives have their own equivalent process and their own number. This call comes before the electrician, not after.
- The repair. Oncor recommends using a licensed, bonded and insured electrician for the work. New meter base, mast or riser, weatherhead, service entrance conductors, hardware at the point of attachment, and grounding and bonding brought up to the code edition your city is enforcing.
- The city inspects. Oncor's guidance notes that most city electric codes require a building code inspection before electric service can be restored, and that the city then sends the utility confirmation that the work passed. InspectandTest's 2026 guide describes the same gate from the trade side: the utility will typically not reconnect a new service without the local inspection sign-off.
- Somebody has to ask for the reconnect. This is the step homeowners lose days to. A finished repair and a passed inspection are not a reconnect request - per Oncor's guidance you call 888.313.6862 to request it. We make that call, and we follow up on it.
One thing to do before anyone unbolts anything: photograph the damage. Several angles, including one wide shot that shows the damage in relation to the house, and one close enough to read any label. Then call your insurance carrier and ask two questions - whether they want to see it before it is repaired, and whether this loss is covered under your policy. Both are policy questions rather than electrical ones, and they are far better asked on day one than after the invoice.
Signs a Meter Base Needs Replacing Before a Storm Decides For You
Most of the meter bases we replace were not hit by anything. They simply reached the end of a service life nobody was tracking, on a house where the only part of the electrical system anyone ever looks at is the panel in the garage. What to look for on the outside wall:
- Rust streaks running down the wall below the base, or rust visible around the lip of the cover. Water has been getting in for a while.
- A cracked, chalky or warped socket cover. Decades of West-facing Texas sun embrittles the enclosure, and a cracked enclosure is no longer keeping rain out.
- Brown or black discoloration, or a melted look, around the jaws the meter plugs into. That is heat from a loose or corroded connection, and it does not improve on its own.
- The meter sitting loose or slightly cocked in the socket. The jaws have lost their grip, which means resistance where the whole house's current passes through.
- A mast that leans, or that has visibly shifted at the point where the service attaches. Masts move in high wind, then do not move back.
- A weatherhead that is cracked, missing its insulating bushing, or sitting at the wrong angle. Its only job is keeping water from running down inside the conduit.
- Service entrance cable with a split, brittle or UV-chalked jacket, or any point where the conductors inside it are visible.
- A hub, fitting or seal that has come apart where the conduit enters the top of the base.
If you are seeing any of this, an electrical safety inspection will tell you whether you are looking at a planned replacement or something more urgent. If there is active arcing, a burning smell at the meter, or the base is visibly hot, treat it as an electrical emergency and get the power cut first.
Mast, Weatherhead and the Code Rules Behind Them
The equipment on the outside of your house looks simple and is governed by a surprising number of specific rules. These are the ones that decide whether a repair passes inspection.
The mast has to be strong enough for the pull. Per EC&M's summary of NEC 230.28(A), a mast supporting the service drop or overhead service conductors must have adequate mechanical strength, braces, or guy wires to withstand the strain caused by the conductors. The code does not define "adequate" with a number, which is exactly why this is an area where local utility specifications and the inspector's judgment carry real weight - and why many utilities publish their own mast size and support requirements. We confirm those for your address rather than guessing from the last job.
Nothing hangs off the mast between the weatherhead and a coupling. NEC 230.28(B) prohibits attaching conductors to a mast between the weatherhead or end of the conduit and a coupling, where the coupling is above the last conduit support or above the building. The point is to keep the pull of the service off a joint that was never designed to take it. Fittings used in a mast also have to be identified for that use.
Heights and clearances. The point of attachment must be at least 10 feet above finished grade (NEC 230.26), and it has to sit where the required clearances can actually be maintained. EC&M's list for NEC 230.24(B) gives the common residential figures: 10 feet above finished grade, sidewalks and surfaces that permit personal contact; 12 feet above residential property and driveways; 15 feet where the voltage to ground exceeds 300 volts; and 18 feet above public streets, alleys and areas traversed by vehicles. Above a roof, 230.24(A) calls for 8 feet 6 inches of vertical clearance for at least 3 feet in all directions from the roof edge, with several exceptions including a reduction to 3 feet where the roof slope exceeds 4 inches of rise per 12 inches of run. This is why a mast repair sometimes comes back taller than the one that failed.
The weatherhead goes above the attachment, and the splices go below it. EC&M's 2024 summary covers the three rules that matter here: service weatherheads on raceways or service entrance cable must be above the point of attachment, and where that is genuinely impractical they must be within 2 feet of it; service entrance cable must be supported within 1 foot of the weatherhead, gooseneck, raceway connection or enclosure; and the drip loop conductors must be connected to the overhead service conductors below the service head or the termination of the cable sheath. That last one is the entire reason a drip loop exists - water runs down a wire, and the splice has to be the low point so it drips off instead of travelling into your conduit.
Service entrance cable subject to physical damage has to be protected. NEC 230.50(B) lists the acceptable methods. On a wall where a mower, a trailer or a basketball hoop can reach it, that is not a formality.
The National Fire Protection Association publishes the National Electrical Code these sections come from, and the Texas Department of Licensing and Regulation adopts it as the state electrical code.
Replacing the Meter Base Usually Pulls the Rest of the Service With It
Homeowners call about one piece and are often surprised that the quote covers several. There are real reasons for that, not padding.
The service disconnect moved outdoors. TDLR adopted the 2026 National Electrical Code as the Texas state electrical code effective September 1, 2026. In that edition, Section 230.85 was deleted and its requirements relocated into 230.70, with the effect that the service disconnecting means for a one- or two-family dwelling must now be outdoors - as Ryan Jackson puts it, no more stickers and no more meter disconnects. Cities adopt and amend editions on their own schedule, so the edition being enforced at your address is something we confirm when we pull the permit. But if your city is on the 2026 NEC, replacing service equipment is the moment that requirement arrives at your house.
A surge protective device comes with the job. Since the 2020 code cycle, an SPD is required when service equipment is replaced. It is part of the work rather than an upsell - our guide to whole-home surge protection explains what the requirement covers and what the device does and does not protect, and whole-home surge protection covers the install.
Grounding and bonding get brought current. The grounding electrode system on a 1970s or 1980s North Texas house is frequently not what today's code expects, and the service replacement is when it is accessible.
And it is the cheapest moment you will ever get to change the service size. If the meter base, the service entrance conductors and the mast are coming off anyway, most of the labor in a capacity upgrade is already in the quote. If your service is 100 or 125 amps and you have been putting off an EV charger, a shop or a second HVAC system, run the numbers now - our 200-amp vs 100-amp panel guide covers how that sizing decision gets made, and the 400-amp service upgrade guide covers the properties where the load calculation lands above 200 amps. If the service has capacity and the problem is only that the panel is full, a sub-panel is the cheaper answer and we will say so.
The honest flip side: if your service is adequate, your panel is sound and only the meter base or the mast failed, we will replace that and leave the rest alone. A storm repair is not a reason to sell you an electrical panel upgrade you do not need.
Underground Services: No Mast, Same Ownership Line
A large share of the newer subdivisions across Celina, Prosper, Frisco and Little Elm are fed underground, and homeowners there sometimes assume none of this applies to them. The equipment is different; the ownership line is not.
With no service drop there is no mast and no weatherhead, but the meter base is still yours, and so is the riser conduit coming up out of the ground into it and the service entrance conductors inside. EC&M's 2024 summary describes underground service conductors as running from the service point to the first point of connection to the service entrance conductors in a terminal box, meter or other enclosure - which puts the meter enclosure squarely at your end of the chain.
What fails on an underground service is a different list: a riser conduit struck by a vehicle, a mower or trimmer, or a trailer backing up; a conduit that has pulled or cracked where the ground has settled, which lets water into the base from below; corrosion inside a base that has been taking on groundwater for years; and damage from digging. Ground movement is not a hypothetical on North Texas clay.
Before any digging near the service, use the state one-call system. Texas811 is the free notification center for Texas: anyone planning to dig deeper than 16 inches is required to contact it at least two business days before digging - and Texas811 is explicit that this applies even in your own backyard. Texas811 notifies the registered utility operators, who send locators to mark their lines; the center itself does not do the marking, and member utilities mark only public utilities, not private lines. Some water and sewer operators are not in the one-call system at all and have to be called separately. If a line does get hit, report it immediately, and call 911 as well if it is a gas line.
If you are planning a pool, a fence, a shop slab or an irrigation run anywhere near where the service comes up, that call is the cheapest step in the project.
Permits, Licensing and Why the Order Matters
Service equipment work is permitted, inspected work in every city we serve. That is not red tape on this particular job - it is the gate the utility uses to decide whether to put you back on.
Electrical contracting in Texas is regulated by the Texas Department of Licensing and Regulation, and service work is squarely licensed-electrician territory. Cities also require contractor registration before they will issue the permit, which is one more reason a storm repair goes faster through someone who is already registered where you live than through whoever answers the phone first. Our guide to choosing a licensed electrician covers what to verify, and the permit guide covers why the paper trail matters at resale and at claim time.
Inspection scheduling is the variable that decides how long you are without power, and it differs by city. Most of our cities inspect on a next-business-day basis with an afternoon cutoff for same-day requests. A few do better than that: Sachse runs after-hours, weekend and holiday emergency electrical inspections, requested through its police department non-emergency line - which is genuinely useful when a mast comes down on a Saturday and the power cannot come back until the work is signed off. We confirm the local process at the start of the job rather than discovering it at 4:30 on a Friday.
If your service is damaged right now, contact us and describe what you are looking at - or text photos. A few clear pictures of the meter base, the mast and the point where the service attaches to the house usually tell us enough to say what the repair involves, what the utility will need to do first, and how the inspection timeline looks in your city.
What it costs
Published national cost data for this specific job is thin, and we would rather say so than invent a range. The closest dated figures: Fixr's panel cost guide, updated January 31, 2025, lists a meter box at $200 to $800 installed - but as a component within panel work, not as a standalone storm repair with a mast, conductors and a utility disconnect attached. InspectandTest's 2026 guide, published October 18 and updated November 12, 2026, prices a 100-to-200-amp service upgrade at about $2,500 to $6,000, and that figure explicitly bundles the new panel, meter base, service entrance conductors, grounding and bonding, and utility coordination. A real quote lands somewhere between those depending on: how much of the chain is being replaced; whether the mast has to come back taller to meet clearances; the service size; whether the panel and grounding are being brought current at the same time; and your city's permit fee, which Fixr puts at $50 to $300 or more. For North Texas labor rates generally, see our electrician cost guide. We quote the specific job after seeing the service - request a free quote.
Meter Base & Mast — FAQ
Is the meter base mine or the electric company's?
The meter base is yours. So are the mast or riser, the weatherhead, the service entrance conductors and the hardware where the service attaches to the house. The utility owns the conductors running to your house and the meter itself. That is why Oncor's storm guidance tells customers with a damaged or pulled-off meter base to contact an electrician for the repair before power can be restored - the equipment is on your side of the service point.
My service got pulled off the house in a storm. Who do I call first?
The utility, not the electrician. Oncor's storm guidance directs customers with a damaged or pulled-off meter base to call 888.313.6862 to initiate a temporary hazardous disconnect so the service can be made safe; other utilities and cooperatives have their own process. The repair has to happen on de-energized equipment. Call us second and we will work the rest of the sequence - repair, city inspection, and the reconnect request - in the right order.
Can I replace the meter base myself, or pull the meter to do it?
No. The meter is utility property and the utility is the only party that should remove it, which is what the hazardous-disconnect process exists for. The work itself is permitted, inspected service equipment work, and the conductors on the line side of a meter base stay energized until the utility cuts them. Your city also will not issue the permit to an unregistered, unlicensed party, and without the inspection the utility will not reconnect.
Do I need a permit, and will the city have to inspect it?
Yes to both, in every city we serve. More importantly, the inspection is what gets your power back: Oncor's guidance notes that most city electric codes require a building code inspection before electric service can be restored, and the city then confirms to the utility that the work passed. We pull the permit, handle the city contractor registration, and schedule the inspection as part of the job.
How long will my power be off?
The repair itself is usually a single day's work. The timeline is set by the two things on either side of it - how quickly the utility can get out to disconnect, and how soon your city can inspect. Most of our cities inspect next business day with an afternoon cutoff; Sachse offers after-hours and weekend emergency electrical inspections. After a widespread storm, utility crews are the constraint. We will tell you honestly what the sequence looks like in your city before you commit.
Does replacing the meter base mean I have to upgrade my panel too?
Not necessarily. If the service size is adequate and the panel is sound, we replace what failed and leave the rest alone. Two things do come with the job regardless: a surge protective device, required since the 2020 code cycle whenever service equipment is replaced, and grounding and bonding brought up to the code edition your city enforces. If your service is 100 or 125 amps and you have been planning an EV charger or a shop, this is the cheapest moment to change the size, because most of the labor is already in the quote.
Helpful guides
Ready for a straightforward, honest quote?
Licensed & insured, owner-operated, and 5.0★ across 186 reviews. No pressure — just a clear, free quote for your home.